March 2014

Works on the construction of copies of Goto Predestination battleship:

- Currently hold the metal case is made by our enterprise installation of wooden constructions of the exhibition hall. As a result of unsightly metal hold a series of cable lines and pipelines has become a orlop decks Russian battleship end of the XVII century.

- Work is being completed for the production of spars and rigging. Preparations for their transportation in the city of Voronezh and installation on the ship's hull.

- Built a six-meter ship's boat, which will be installed on the ship rostra between foremast and mainmast. As a prototype for the design rowing boats were used, depicted in the engravings Petrovsky time, as well as the grandfather of the Russian fleet small boat Saint Nicholas.

- Made binnacle and steering wheel.


Photo:

→ To list